So I'm producing an item in a shipyard.
I pause, said item to start the next item in the queue.
Except I can't seem to be able to move the second item in the queue up to the first slot.
According to the rules: "1.2.4/ The Production Queue & Interface
Each project may have a maximum quantity of 48and up to 20projects may be queued up at once. Projects that are paused or queued may be moved up and down the queue, edited, or deleted at will."
As I'm not very familiar with the production process, I'm hoping someone with some more experience can perhaps tell me what I'm missing.
I don't wish to abort the production of the lead item, and lose those DCs or materials, but I'm getting to the point of aborting it as the only option to start on the next item in the queue.
Any Ideas what I may be missing?
Thanks..
PS:
I filed a bug recently as well, wasn't sure if it's something I'm doing wrong in the process or what?
I pause, said item to start the next item in the queue.
Except I can't seem to be able to move the second item in the queue up to the first slot.
According to the rules: "1.2.4/ The Production Queue & Interface
Each project may have a maximum quantity of 48and up to 20projects may be queued up at once. Projects that are paused or queued may be moved up and down the queue, edited, or deleted at will."
As I'm not very familiar with the production process, I'm hoping someone with some more experience can perhaps tell me what I'm missing.
I don't wish to abort the production of the lead item, and lose those DCs or materials, but I'm getting to the point of aborting it as the only option to start on the next item in the queue.
Any Ideas what I may be missing?
Thanks..
PS:
I filed a bug recently as well, wasn't sure if it's something I'm doing wrong in the process or what?